The global data center construction market size is expected to reach around US$ 369.6 billion by 2030 and is expected to grow at an impressive double-digit rate of 6.7% from 2022 to 2030. The growth of the global data center construction market is being driven by the expansion of the information technology sector.

The study includes drivers and restraints of this market. The study provides an analysis of the global data center construction market for the period 2017-2030, wherein 2022 to 2030 is the forecast period and 2021 is considered as the base year.
Report Scope of the Data Center Construction Market
| Report Coverage | Details |
| Market Size by 2030 | USD 369.6 Billion |
| CAGR from 2022 to 2030 | CAGR of 6.7% |
| North America Market Share in 2021 | 45% |
| Cooling Segment Hit The Revenue Share in 2021 | 60% |
| Base Year | 2021 |
| Forecast Period | 2022 to 2030 |
Our Free Sample Reports Includes:
- In-depth Industry Analysis, Introduction, Overview, and COVID-19 Pandemic Outbreak.
- Impact Analysis 150+ Pages Research Report (Including latest research).
- Provide chapter-wise guidance on request 2022 Updated Regional Analysis with Graphical Representation of Trends, Size, & Share, Includes Updated List of figures and tables.
- Updated Report Includes Major Market Players with their Sales Volume, Business Strategy and Revenue Analysis by using Precedence Research methodology.
Download Free Sample Copy Here (Including TOC, List of Tables & Figures, and Chart) @ https://www.precedenceresearch.com/sample/1704
Research Methodology
A unique research methodology has been utilized to conduct comprehensive research on the growth of the global data center construction market and arrive at conclusions on the future growth prospects of the market. This research methodology is a combination of primary and secondary research, which helps analysts warrant the accuracy and reliability of the draw conclusions. Secondary sources referred to by analysts during the production of the global market report include statistics from company annual reports, SEC filings, company websites, World Bank database, investor presentations, regulatory databases, government publications, and industry white papers. Analysts have also interviewed senior managers, product portfolio managers, CEOs, VPs, and market intelligence managers, who contributed to the production of our study on the market as a primary source.
These primary and secondary sources provided exclusive information during interviews, which serves as a validation from mattress topper industry leaders. Access to an extensive internal repository and external proprietary databases allows this report to address specific details and questions about the global data center construction market with accuracy. The study also uses the top-down approach to assess the numbers for each segment and the bottom-up approach to counter-validate them. This has helped to estimates the future prospects of the global market more reliable and accurate.
Why should you invest in this report?
If you are aiming to enter the global data center construction market, this report is a comprehensive guide that provides crystal clear insights into this niche market. All the major application areas for data center construction are covered in this report and information is given on the important regions of the world where this market is likely to boom during the forecast period of 2022-2030, so that you can plan your strategies to enter this market accordingly.
Besides, through this report, you can have a complete grasp of the level of competition you will be facing in this hugely competitive market and if you are an established player in this market already, this report will help you gauge the strategies that your competitors have adopted to stay as market leaders in this market. For new entrants to this market, the voluminous data provided in this report is invaluable.
Some of the prominent players in the global data center construction market include:
- Page Southerland Page
- Syska Hennessy Group
- Holder Construction Group
- Turner Construction Company
- Jones Engineering Group
- DPR Construction
- Arup Group
- Corgan Associates Inc.
- AECOM
- Gensler
Market Segmentation:
By IT Infrastructure
- Networking Equipment
- Servers
- Storage
By Power Distribution and Cooling Infrastructure
- Power Distribution
- Cooling
By Tier Type
- Tier 1
- Tier 2
- Tier 3
By End Use
- IT & Telecom
- BFSI
- Government & Defense
- Healthcare
- Energy
- Others
By Size of Data Center
- Small and Medium-Scale Data Center
- Large-scale Data Center
Regional Analysis:
The geographical analysis of the global data center construction market has been done for North America, Europe, Asia-Pacific, and the Rest of the World.
The North American Market is again segmented into the US, Canada, and Mexico. Coming to the European Market, it can be segmented further into the UK, Germany, France, Italy, Spain, and the rest. Coming to the Asia-Pacific, the global data center construction Market is segmented into China, India, Japan, and Rest of Asia Pacific. Among others, the market is segmented into the Middle East and Africa, (GCC, North Africa, South Africa and Rest of the Middle East & Africa).
Key Questions Answered by the Report:
- What will be the size of the global data center construction market in 2030?
- What is the expected CAGR for the data center construction market between 2021 and 2030?
- Which are the top players active in this global market?
- What are the key drivers of this global market?
- How will the market situation change in the coming years?
- Which region held the highest market share in this global market?
- What are the common business tactics adopted by players?
- What is the growth outlook of the global data center construction market?
TABLE OF CONTENT
Chapter 1. Introduction
1.1. Research Objective
1.2. Scope of the Study
1.3. Definition
Chapter 2. Research Methodology
2.1. Research Approach
2.2. Data Sources
2.3. Assumptions & Limitations
Chapter 3. Executive Summary
3.1. Market Snapshot
Chapter 4. Market Variables and Scope
4.1. Introduction
4.2. Market Classification and Scope
4.3. Industry Value Chain Analysis
4.3.1. Raw Material Procurement Analysis
4.3.2. Sales and Distribution Channel Analysis
4.3.3. Downstream Buyer Analysis
Chapter 5. COVID 19 Impact on Data Center Construction Market
5.1. COVID-19 Landscape: Data Center Construction Industry Impact
5.2. COVID 19 - Impact Assessment for the Industry
5.3. COVID 19 Impact: Global Major Government Policy
5.4. Market Trends and Opportunities in the COVID-19 Landscape
Chapter 6. Market Dynamics Analysis and Trends
6.1. Market Dynamics
6.1.1. Market Drivers
6.1.2. Market Restraints
6.1.3. Market Opportunities
6.2. Porter’s Five Forces Analysis
6.2.1. Bargaining power of suppliers
6.2.2. Bargaining power of buyers
6.2.3. Threat of substitute
6.2.4. Threat of new entrants
6.2.5. Degree of competition
Chapter 7. Competitive Landscape
7.1.1. Company Market Share/Positioning Analysis
7.1.2. Key Strategies Adopted by Players
7.1.3. Vendor Landscape
7.1.3.1. List of Suppliers
7.1.3.2. List of Buyers
Chapter 8. Global Data Center Construction Market, By IT Infrastructure
8.1. Data Center Construction Market, by IT Infrastructure, 2022-2030
8.1.1. Networking Equipment
8.1.1.1. Market Revenue and Forecast (2017-2030)
8.1.2. Servers
8.1.2.1. Market Revenue and Forecast (2017-2030)
8.1.3. Storage
8.1.3.1. Market Revenue and Forecast (2017-2030)
Chapter 9. Global Data Center Construction Market, By Power Distribution and Cooling Infrastructure
9.1. Data Center Construction Market, by Power Distribution and Cooling Infrastructure, 2022-2030
9.1.1. Power Distribution
9.1.1.1. Market Revenue and Forecast (2017-2030)
9.1.2. Cooling
9.1.2.1. Market Revenue and Forecast (2017-2030)
Chapter 10. Global Data Center Construction Market, By Tier Type
10.1. Data Center Construction Market, by Tier Type, 2022-2030
10.1.1. Tier 1
10.1.1.1. Market Revenue and Forecast (2017-2030)
10.1.2. Tier 2
10.1.2.1. Market Revenue and Forecast (2017-2030)
10.1.3. Tier 3
10.1.3.1. Market Revenue and Forecast (2017-2030)
Chapter 11. Global Data Center Construction Market, By End Use
11.1. Data Center Construction Market, by End Use, 2022-2030
11.1.1. IT & Telecom
11.1.1.1. Market Revenue and Forecast (2017-2030)
11.1.2. BFSI
11.1.2.1. Market Revenue and Forecast (2017-2030)
11.1.3. Government & Defense
11.1.3.1. Market Revenue and Forecast (2017-2030)
11.1.4. Healthcare
11.1.4.1. Market Revenue and Forecast (2017-2030)
11.1.5. Energy
11.1.5.1. Market Revenue and Forecast (2017-2030)
11.1.6. Others
11.1.6.1. Market Revenue and Forecast (2017-2030)
Chapter 12. Global Data Center Construction Market, By Size of Data Center
12.1. Data Center Construction Market, by Size of Data Center, 2022-2030
12.1.1. Small and Medium-Scale Data Center
12.1.1.1. Market Revenue and Forecast (2017-2030)
12.1.2. Large-scale Data Center
12.1.2.1. Market Revenue and Forecast (2017-2030)
Chapter 13. Global Data Center Construction Market, Regional Estimates and Trend Forecast
13.1. North America
13.1.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.1.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.1.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.1.4. Market Revenue and Forecast, by End Use (2017-2030)
13.1.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.1.6. U.S.
13.1.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.1.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.1.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.1.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.1.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.1.8. Rest of North America
13.1.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.1.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.1.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.1.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.1.8.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2. Europe
13.2.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.4. Market Revenue and Forecast, by End Use (2017-2030)
13.2.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.6. UK
13.2.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.7. Market Revenue and Forecast, by End Use (2017-2030)
13.2.8. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.9. Germany
13.2.9.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.9.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.9.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.10. Market Revenue and Forecast, by End Use (2017-2030)
13.2.11. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.12. France
13.2.12.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.12.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.12.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.12.4. Market Revenue and Forecast, by End Use (2017-2030)
13.2.13. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.14. Rest of Europe
13.2.14.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.14.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.14.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.14.4. Market Revenue and Forecast, by End Use (2017-2030)
13.2.15. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3. APAC
13.3.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.6. India
13.3.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.8. China
13.3.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.9. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.10. Japan
13.3.10.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.10.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.10.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.10.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.10.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.11. Rest of APAC
13.3.11.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.11.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.11.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.11.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.11.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4. MEA
13.4.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.6. GCC
13.4.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.8. North Africa
13.4.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.9. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.10. South Africa
13.4.10.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.10.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.10.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.10.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.10.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.11. Rest of MEA
13.4.11.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.11.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.11.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.11.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.11.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.5. Latin America
13.5.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.5.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.5.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.5.4. Market Revenue and Forecast, by End Use (2017-2030)
13.5.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.5.6. Brazil
13.5.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.5.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.5.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.5.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.5.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.5.8. Rest of LATAM
13.5.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.5.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.5.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.5.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.5.8.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
Chapter 14. Company Profiles
14.1. Page Southerland Page
14.1.1. Company Overview
14.1.2. Product Offerings
14.1.3. Financial Performance
14.1.4. Recent Initiatives
14.2. Syska Hennessy Group
14.2.1. Company Overview
14.2.2. Product Offerings
14.2.3. Financial Performance
14.2.4. Recent Initiatives
14.3. Holder Construction Group
14.3.1. Company Overview
14.3.2. Product Offerings
14.3.3. Financial Performance
14.3.4. Recent Initiatives
14.4. Turner Construction Company
14.4.1. Company Overview
14.4.2. Product Offerings
14.4.3. Financial Performance
14.4.4. Recent Initiatives
14.5. Jones Engineering Group
14.5.1. Company Overview
14.5.2. Product Offerings
14.5.3. Financial Performance
14.5.4. Recent Initiatives
14.6. DPR Construction
14.6.1. Company Overview
14.6.2. Product Offerings
14.6.3. Financial Performance
14.6.4. Recent Initiatives
14.7. Arup Group
14.7.1. Company Overview
14.7.2. Product Offerings
14.7.3. Financial Performance
14.7.4. Recent Initiatives
14.8. Corgan Associates Inc.
14.8.1. Company Overview
14.8.2. Product Offerings
14.8.3. Financial Performance
14.8.4. Recent Initiatives
14.9. AECOM
14.9.1. Company Overview
14.9.2. Product Offerings
14.9.3. Financial Performance
14.9.4. Recent Initiatives
14.10. Gensler
14.10.1. Company Overview
14.10.2. Product Offerings
14.10.3. Financial Performance
14.10.4. Recent Initiatives
Chapter 15. Research Methodology
15.1. Primary Research
15.2. Secondary Research
15.3. Assumptions
Chapter 16. Appendix
16.1. About Us
16.2. Glossary of Terms